* Agenda
- Recap: API deployment architecture
- Lessons from the Rails 6.0/6.1 upgrade
- Defining key performance indicators
* Recap: API Deployment
The API deployment consists of:
- **frontend pods** - 10 Pods dedicated to serving HTTP traffic
- **worker pods** - 8 pods dedicated to job processing
- **cron jobs** - various rake tasks executed to perform periodic upkeep necessary for the APIcontext
** Release Candidate Deployment Strategy
This is a form of a canary deployment strategy. This strategy involves
diverting just a small amout of traffic to the new version, while looking
for an increased error rate. After some time, we assess how the
candidate has been performing. If things look bad, then we scale back
and address the issues. Otherwise we ramp up the amount of traffic
that the pods see.
Doing things this way allows us to build confidence in the release but
it does not come without drawbacks. The most important thing to be
aware of is that we're relying on the k8s service to load balance
between the two versions of the application. That means that we're not
doing any tricks to make sure that a customer is only ever hitting a
single app version.
We accept this risk because issues with HTTP requests are mostly
confined to the request and each span stamps the rails version that
processed that portion of the request.
Some HTTP requests are not completed completely at the
request/response time. For these endpoints, we queue up background
jobs that the workers eventually process. This means that some
requests will be processed by the release candidate, and the
background job will be processed by the older application version.
Because of this, when using this release strategy, we're assuming that
the two versions are compatible, and can run side-by-side.
* Lessons from Previous Rails Upgrades
We have telemetry set up to monitor the system as a whole, so
identifying whether or not something looks like an issue related to
the upgrade or is unrelated has been left to SMEs intution.
In the rails 5.2->6.0 upgrade we hit a couple issues:
- Rails 6 jobs were not able to be served with 5 workers
- We addressed this before rolling forwards
- Prometheus-client upgrade meant that all the cron jobs succeeded but
failed to report their status.
In the rails 6.1 upgrade we observed a new issue with respect to users
seeing 404s through the portal, after hitting the =/organizations=
endpoint.
- I decided that the scope of the bug was small enough that we were
okay to roll forward.
- Error rates looked largely the same because the symptom that we
observed was an increased number of 403s on the Projects Controller
* Defining key performance indicators
Typically, what I would do (and what I assume Lucas does) is just keep
an eye on Rollbar. Rollbar would capture things that are at least
fundamentally broken that would cause exceptions or errors in
Rails. Additionally, I would keep a broad view on errors by span kind
in honeycomb to see if we were seeing a spike associated with the
release candidate.